Feather Prime Block Operation Prior to Waterborne Painting Process
26.9 هزار بار بازدید -
8 سال پیش
-
Standard Operating Procedure for the
Standard Operating Procedure for the Feather Prime and Block operation to transition the body work to the waterborne painting process. Use 3M™ Guide Coat during blocking to check work and to help look for in-line scratches during final DA sand of primer surfacer.
8 سال پیش
در تاریخ 1394/12/24 منتشر شده
است.
26,921
بـار بازدید شده