Feather, Prime, and Block Operation - From Body Work to Painting Process
49.5 هزار بار بازدید -
8 سال پیش
-
Standard Operating Procedure for the
Standard Operating Procedure for the Feather, Prime and Block operation to transition the body work to the painting process. Use 3M™ Guide Coat during blocking to check work and to help look for in-line scratches dursting final DA sand of primer surface.
8 سال پیش
در تاریخ 1394/12/24 منتشر شده
است.
49,528
بـار بازدید شده