20.5 هزار بار بازدید - 10 سال پیش - Shows construction sequence, methods, photographs
Shows construction sequence, methods, photographs  and timeline for constructing a 4 span road bridge with a 175m long insitu concrete box girder post tensioned deck. The foundation are piled with 900mm diameter by 20m long insitu piles and the ground behind the abutments is surcharged as part of ground improvement.