Malswick. June / July 2023. Extending The Cut. More Canal In Water.

Herefordshire and Gloucestershire Canal Trust
Herefordshire and Gloucestershire Canal Trust
5 هزار بار بازدید - پارسال - In May 2023 H&GCT got
In May 2023 H&GCT got part of the canal cut at Malswick in water. See https://www.seevid.ir/fa/w/q3jFj2vhxFU for details. This video covers the second phase. Digging a further section of the new cut to full depth and width, and using the extracted material to raise the embankment over the low-lying ground to link up with the section of canal currently in water. For more information on The Herefordshire and Gloucestershire Canal Trust visit our website. https://www.h-g-canal.org.uk/ Erratum. The caption at https://www.seevid.ir/fa/w/or6ems_XS6E is in the wrong place. It refers to the loose clay in the bottom of the cut at the low point of the small culvert, visible at https://www.seevid.ir/fa/w/or6ems_XS6E, https://www.seevid.ir/fa/w/or6ems_XS6E and other places within the video.
پارسال در تاریخ 1402/04/24 منتشر شده است.
5,041 بـار بازدید شده
... بیشتر