HOW3 - Building and fitting Peco PL-15 micro-switched PL-10E point motors.
24.4 هزار بار بازدید -
11 سال پیش
-
During this video we will
During this video we will build a PL-10E point motor fitted with Peco's PL-15 Twin Micro-switch and Peco's Pl-34 wiring loom.
Once built and roughly setup we will proceed to fit the switch under the baseboard and wire it to switch the electro-frog polarity as the point (turnout) is thrown and to set the layout panel LEDs to display the route direction.
We'll be using the PL-26 switches housed in a PL-50 switch block to aid the installation. Using Express Model's solder-less wiring, the whole installation will remain solder less throughout.
Once built and roughly setup we will proceed to fit the switch under the baseboard and wire it to switch the electro-frog polarity as the point (turnout) is thrown and to set the layout panel LEDs to display the route direction.
We'll be using the PL-26 switches housed in a PL-50 switch block to aid the installation. Using Express Model's solder-less wiring, the whole installation will remain solder less throughout.
11 سال پیش
در تاریخ 1392/06/20 منتشر شده
است.
24,443
بـار بازدید شده