Worcester 8000 System Boiler Installation: The Final Week

Blue Bulldog Plumbing
Blue Bulldog Plumbing
3.6 هزار بار بازدید - 11 ماه پیش - Boiler install, Worcester 8000 boiler.
Boiler install, Worcester 8000 boiler. Also installing a 250L unvented cylinder and all the pipework with 5 zones. Plumbing in our biggest job to date in the final week of the renovation where we have been installing all the plumbing and heating.

The Worcester 8000 system boiler is a great bit of kit and we also install the Worcester internal diverter valve to convert the boiler into having 2 flows and 2 returns. This means we can install a direct feed to the cylinder controlled by the boiler without the need for an additional zone.

In the this video you will see how to plan out boiler pipework for the flow and returns and how to fit a Worcester internal divertor valve on a system boiler. Another part of the video you will see how we pipe up close coupled Tees instead of installing a low lose header.

We also plumb in 4 Honeywell zone valves with lever valves to help with future maintenance, how to run the cold feed and install the inlet control valve, how to install a potable expansion vessel, how to install a heating expansion vessel and also how we pre plumb some of the pipework for the cylinder

We take a look at the Tesla expansion vessel Bar, Spirotech deaerator and the Worcester 28mm magnetic system filter

Subscription goal 2700/3000

Any questions just drop me a comment i will do my best to get back to you, 2k giveaway winner announced on MONDAYS upload so make sure you SUBSCRIBE for that

Thank you all again for your continued support



00:00 Introduction
01:40 Planning out the pipework
03:25 How to install a Worcester system diverter valve
04:28 Laying the pipework
06:54 Installing 28mm worcester filter and 28mm dearetor
08:25 Hanging the boiler and connecting up
09:07 Close Coupled tee
10:03 Installing secondary pump and zone valves
11:29 Installing the cylinder pipework
13:12 Tesla Expansion vessel bar
14:34 Finishing off Day 3 with more pipework
11 ماه پیش در تاریخ 1402/08/04 منتشر شده است.