Concrete Bridge Deck Pour

Delaware T2 Center
Delaware T2 Center
1.2 هزار بار بازدید - 12 ماه پیش - Months of preparation precede the
Months of preparation precede the deck pour, from foundations to abutments, piers, steel or concrete beams, deck pans, joint armor, reinforcing steel, and parapet wall steel, but the deck pour is "for the money."   A durable bridge that provides a long service life depends upon a high-quality deck pour and just some of the details are shown here.  

US 301 in Delaware was constructed over a 3-year period using seven contracts, in addition to advance clearing, tolling, and landscaping.  It extends from the Maryland /Delaware State Line to State Route 1, and was opened to traffic on January 10, 2019.  It is a 14-mile limited access highway with four interchanges, 28 bridges, and an all-electronic tolling (AET) system.

The Delaware T2/LTAP Center provides direct technical assistance, training, and technology transfer to Delaware local agencies relative to their transportation challenges.  

https://sites.udel.edu/dct/t2-center/
12 ماه پیش در تاریخ 1402/06/31 منتشر شده است.
1,233 بـار بازدید شده
... بیشتر