CP SD40’s Unloading Side Dump Cars with Huge Rocks for Railroad Repairs in the Thompson Canyon!

Trackside Tyson
Trackside Tyson
530.4 هزار بار بازدید - 2 سال پیش - CP 5875 starting off the
CP 5875 starting off the morning waiting for 5 trains to meet before they can proceed west to Drynoch and proceed "siding to siding" said RTC. After waiting for 5 eastbound trains CP 5875 work train departs Spences Bridge and heads past Drynoch only to realize they had 200 feet of train that wouldn't have fit as there were gondolas parked in the siding, thankfully the new plan was to head for Thompson to unload the Side Dump Cars for some railroad repairs on the CP Thompson Subdivision. Check below for information about trains featured in this video, also feel free to skip ahead to any Chapters in this video. Thanks for watching, please Subscribe!

Chapters:

0:00 CP rock train waiting for a few trains before they depart

0:15 CP 200 meeting CP Work Train

1:14 CP work train through Drynoch

2:53 CP work train at Tank Hill with a fine sounding K3L

3:19 CP work train arriving at the dump site

4:15 Spotting up the guys coming to a stop in 10 cars

4:39 Unloading Side Dump Cars with Huge Rocks

4:53 CP 201 overtaking the work train from the CN side!

5:30 CP work train ahead for another dump

7:15 Air dump car in action!

8:30 CP work train pulling ahead for their 4th dump

10:40 Dumping big load of rocks!

11:37 Work train Ahead for another dump

12:05 Struggling to get that car to lift with the air pressure!

(All video content owned by © Trackside Tyson 3/12/22)
2 سال پیش در تاریخ 1400/12/22 منتشر شده است.
530,480 بـار بازدید شده
... بیشتر