🏞️Dhobikhola Corridor Construction Latest Update | Rudramati River Corridor Construction Latest News
15 هزار بار بازدید -
2 سال پیش
-
Dhobikhola Corridor (Rudramati River) Construction
Dhobikhola Corridor (Rudramati River) Construction Latest Update
DHOBIKHOLA CORRIDOR IMPROVEMENT PROJECT
1993 AD - Studied Completed by JICA
2059 BS - Kathmandu Metropolitan City (KMC) started the project
2064 BS - KMC unable to allocate budget and this project is handover to Kathmandu Valley Development Authority
2067 BS onwards regular budget for this project
Three section-
Section 1 - Dobhan (Near UN Park) to Baijani Pul (Chabahil)
Section 2 - Baijani Pul (Chabahil) to Bhangal
Section 3- Bhangal to Ram Mandir Area
Total length of corridor 24 KM, 9m Wide (with 7m 2 lane road, 1.5 m footpath, 0.5m greenery)
#RAY4U
#RudramatiCorridor
#DhobikholaCorridor
Facebook (फेसबुकमा जोडीनुस) - Facebook: RAY4U.RAY4U
Mail us (पत्राचार गर्नुस) - [email protected]
Music: https://www.bensound.com
DHOBIKHOLA CORRIDOR IMPROVEMENT PROJECT
1993 AD - Studied Completed by JICA
2059 BS - Kathmandu Metropolitan City (KMC) started the project
2064 BS - KMC unable to allocate budget and this project is handover to Kathmandu Valley Development Authority
2067 BS onwards regular budget for this project
Three section-
Section 1 - Dobhan (Near UN Park) to Baijani Pul (Chabahil)
Section 2 - Baijani Pul (Chabahil) to Bhangal
Section 3- Bhangal to Ram Mandir Area
Total length of corridor 24 KM, 9m Wide (with 7m 2 lane road, 1.5 m footpath, 0.5m greenery)
#RAY4U
#RudramatiCorridor
#DhobikholaCorridor
Facebook (फेसबुकमा जोडीनुस) - Facebook: RAY4U.RAY4U
Mail us (पत्राचार गर्नुस) - [email protected]
Music: https://www.bensound.com
2 سال پیش
در تاریخ 1400/11/18 منتشر شده
است.
15,029
بـار بازدید شده