Epic Concrete Pour! | Single Storey Extension #4

Build With A&E
Build With A&E
44.4 هزار بار بازدید - 3 سال پیش - We're proud to be sponsored
We're proud to be sponsored by James Hardie, the global leaders in manufacturing fibre cement products. Be sure to check out their exciting range of products here: https://bit.ly/3kpdtRd

In this episode SINGLE STOREY EXTENSION #4 - CONCRETE POUR, the guys continue to prepare footings ready for pumping concrete later in the day. Tony and John are in the foundation trench having to hand dig footings to get a nice square edge footing. Digging down to get a 2.5m footing they have to tackle the blue lias stone. Pete is at hand to construct concrete forms which act as plywood shuttering ready for the concrete footings.The trusty yanmar vio17 is in action and Joe is on the cormidi c85 mini dumper.John sets up the laser level to ensure when pouring concrete into footings they get good level foundation footings. Using a water pump the footings are drained, the concrete pump arrives and we are ready to pour footings. During the pouring process the concrete vibrating poker disperses any air bubbles that might form and few checks with the laser level, job done.

PLEASE NOTE: we’ll endeavour to answer questions and comments as soon as possible depending on our work schedules.
_________________________________

For all our socials! ▶https://linktr.ee/buildwith_ae

Music from Epidemic Sound and the YouTube Audio Library
_________________________________

#ExtensionBuild #ConcretePour #Construction

Epic Concrete Pour! | Single Storey Extension #4
3 سال پیش در تاریخ 1400/03/14 منتشر شده است.
44,474 بـار بازدید شده
... بیشتر