Reading & Northern T-1 2102 Steam Train Pulling HARD Through Jim Thorpe Junction (6/22/24)
3.5 هزار بار بازدید -
3 ماه پیش
-
READ:After getting permission to pass
READ:
After getting permission to pass a stop signal at CP Coal, then a clear signal at CP River, Shane Fredrickson drags the throttle to the roof to get a running start for the final hill up to Nesquehoning Campus after a long day running to Pittston/Tunkhannock and back. Enjoy =)
Full Pittston/Tunkhannock trips compilation: Return Of Big Steam To The Lehigh Div...
After getting permission to pass a stop signal at CP Coal, then a clear signal at CP River, Shane Fredrickson drags the throttle to the roof to get a running start for the final hill up to Nesquehoning Campus after a long day running to Pittston/Tunkhannock and back. Enjoy =)
Full Pittston/Tunkhannock trips compilation: Return Of Big Steam To The Lehigh Div...
3 ماه پیش
در تاریخ 1403/04/03 منتشر شده
است.
3,512
بـار بازدید شده