Reading & Northern T-1 2102 Steam Train Pulling HARD Through Jim Thorpe Junction (6/22/24)

Fan Railer
Fan Railer
3.5 هزار بار بازدید - 3 ماه پیش - READ:After getting permission to pass
READ:
After getting permission to pass a stop signal at CP Coal, then a clear signal at CP River, Shane Fredrickson drags the throttle to the roof to get a running start for the final hill up to Nesquehoning Campus after a long day running to Pittston/Tunkhannock and back. Enjoy =)
Full Pittston/Tunkhannock trips compilation: Return Of Big Steam To The Lehigh Div...
3 ماه پیش در تاریخ 1403/04/03 منتشر شده است.
3,512 بـار بازدید شده
... بیشتر