Well Completion : Casing Head
36.2 هزار بار بازدید -
11 سال پیش
-
The adapter between the first
The adapter between the first casing string and either the BOP stack (during drilling) or the wellhead (after completion). This adapter may be threaded or welded onto the casing, and may have a flanged or clamped connection to match the BOP stack or wellhead.
11 سال پیش
در تاریخ 1391/12/16 منتشر شده
است.
36,250
بـار بازدید شده