SRINAGAR KARGIL RAIL LINK क्यों CANCEL हुआ ? || BILASPUR LEH RAILWAY PROJECT PROGRESS🇮🇳

RF GAURAV
RF GAURAV
38 هزار بار بازدید - - SRINAGAR KARGIL RAIL LINK क्यों
SRINAGAR KARGIL RAIL LINK क्यों CANCEL हुआ ? || BILASPUR LEH RAILWAY PROJECT PROGRESS🇮🇳

The Bhanupli–Leh line is an under-construction electrified railway track connecting Bhanupli, Punjab,[2] to Leh, Ladakh.Once complete, the 489 km (304 mi) long, 1,676 mm (5 ft 6 in) wide gauge all-weather track is stipulated to reduce travel time from New Delhi to Leh to 10 hours. The railway is to pass through seismic zone IV and V at an elevation of 600 m (2,000 ft) to 5,360 m (17,590 ft) above sea level. The line, with a total length of 489 km (304 mi), including the 13 km (8.1 mi) Leh-Sasherthang rail link, will cost ₹99,000 crore (~US$12.4 billion). This includes ₹62,0000 crore (~US$7.75 billion) for 62 tunnels totaling 270 km (170 mi) in length, 114 major bridges, and 90 minor bridges.

All QURIES -
bilaspur manali leh railway line
bilaspur leh railway line
leh bilaspur railway line
bilaspur leh railway line project
bilaspur manali leh railway line update
bilaspur leh railway line update
bhanupali bilaspur railway line
katra banihal railway project update
manali leh railway project
leh railway line project
bhanupalli beri bilaspur railway line
bilaspur leh railway line
bilaspur
bilaspur leh railway line latest news
USBRL PROJECT
SRINAGAR
KASHMIR







#usbrlproject #srinagar #ladakh #leh #kashmir #chenabbridge #indianrailways #train #usbrl #manali #katra #nationalhighway  #nhai  #flyoverbridge #amarnathyatra  #amarnathyatralatestupdate  #usbrl #tunnel #tunnelcollapse  #newdelhi  #chenabbridgeupdates  #indianrailways
55 سال پیش در تاریخ 1403/04/24 منتشر شده است.
38,083 بـار بازدید شده
... بیشتر