Satisfactory - Block, Path, and Subdivided Path 4-Way Train Junction Comparison

BitwiseAssembly
BitwiseAssembly
11.9 هزار بار بازدید - 4 هفته پیش - Visual Comparison of different styles
Visual Comparison of different styles of 4-Way train junctions with multiple Signaling methods  

This Video Compares the performance of five 4-Way train junctions
Roundabout, Double Roundabout, Cross Intersection, Roundabout w/Slip Lanes, Reverse Roundabout w/Slip Lanes, Turbine Interchange, and Stack Interchange.    

The train schedules are encoded in the colors of the train cars and each intersection type is record for 9mins. at the end of each video display the intersection entry counts for each train.

0:00 Synced up View of all junctions.
1:00 Roundabout test
3:15 Roundabout maps and results    
3:32 Cross Intersection test
5:47 Cross Intersection maps and results
6:05 Double Roundabout test
8:20 Double Roundabout maps and results
8:38 Roundabout w/Slip Lanes test
10:53 Roundabout with Slip Lanes maps and results
11:11 Reverse Roundabout w/Slip Lanes Test
13:26 Reverse Roundabout w/Slip Lanes maps and results
13:44 Turbine Interchange Test
15:59 Turbine Interchange maps and results
16:21 Stack Interchange test
18:35 Stack Interchange map and results
18:50 Complete Ranking table
19:20 Some Failures
19:31 Thanks for watching.
4 هفته پیش در تاریخ 1403/04/15 منتشر شده است.
11,966 بـار بازدید شده
... بیشتر