Culvert Placement at OIA - Sims Crane & Equipment

Sims Crane
Sims Crane
1.6 هزار بار بازدید - 4 سال پیش - Sims Crane sets concrete precast
Sims Crane sets concrete precast box culverts for the Orlando International Airport Expansion Project. Each culvert weighs 42,000 lbs. at a working radius of 100’. The crane is the Tadano ATF400G-4 with 260,200 lbs. of counterweight.

Installation of the culverts was expected to last 2 full weeks (10 days) but the crew finished in 8 days.
4 سال پیش در تاریخ 1399/04/10 منتشر شده است.
1,607 بـار بازدید شده
... بیشتر