193.9 هزار بار بازدید - 9 سال پیش - This Gold Mineral Processing Plant
This Gold Mineral Processing Plant in Tanzania is the real case from Xinhai.
The Tanzania 1,200t/d gold mineral processing plant was an EPC+M+O project. The ore consisted of sulfide (10.7g/t) and oxide (2.4g/t), with Au being the only valuable element. They achieved a leaching rate of 93.75% and 91.58% respectively through the all-slime cyanidation gold extraction process.
(https://www.xinhaimining.com/cases?yo...)
1. The All-slime cyanidation process was adopted.
2.Crushing stage: one open-circuit crushing process;
3.Grinding and classification stage: one closed-circuit grinding, cyclone classification process;
4. The separation stage adopted the all-slime cyanidation process was adopted, the gold-bearing carbon entered the desorption electrolysis system to extract gold, smelting gold slime, and the tailings were stacked after the thickening and dewatering.
During the project construction, it took effective steps to address the shortage of material, machinery, tools, and technicians.
As most of the equipment is made of thin steel, it adopted effective and sound measures to avoid the deforming of equipment during lifting and transportation and ensure construction quality.
From the #mine_plant_design to the plant operation, all the things are completed by Xinhai. Xinhai team solve the problems of #gold_processing for clients face to face.
(Other cases:Malaysia CNMC 700TPD Gold Project | X...)
-------------------------------------------------------------------------------------------------------------------------------------------------------------
More cases please send email to
E-mail: [email protected]
WhatsApp: +86 185 0316 1314
Web:https://www.xinhaimining.com/case?you...
9 سال پیش در تاریخ 1394/09/01 منتشر شده است.
193,916 بـار بازدید شده
... بیشتر