This video was filmed on March 2, 2024, at 0:30 a.m., near Sozenji Station on the Hankyu Kyoto Line.

The construction work shown in this video is part of the Awaji Station Elevated Railway Construction Project. Due to the dense construction site, various construction methods are used depending on the location.

This video focuses on the use of a large crane to lift and install concrete PC girders. Since the PC bridge is installed diagonally above the existing track, the work is done at night after train services have ended.

Watch as the massive PC girder is lifted by the crane and rotated 180 degrees, with workers carefully controlling its position using ropes. This is a truly fascinating sight!

Video Contents:

00:00 Preparation for work
01:07 Start of girder lifting by crane (West side view)
08:50 Start of girder lifting by crane (East side view)