PPAP ( Production Part Approval Process ) Explained in Tamil | Effective Time Tamil

AK TVR
AK TVR
15.2 هزار بار بازدید - 4 سال پیش - Hello Friends and thank you
Hello Friends and thank you so much for coming to my YouTube channel.
PPAP 18 Elements:
1) Design record
2)Authorized engineering change documents
3) Customer engineering approval
4) DFMEA (Design failure modes and effects analysis)
5) Process flow diagram
6) PFMEA (Process failure modes and effect analysis)
7) Control plan
8) Measurement system analysis- Gauge R&R
9) Dimensional results
10) Records of material \ performance test results
11) Initial process studies
12) Qualified laboratory documentation
13) Appearance approval report
14) Sample production parts
15) Master sample
16) Checking aids
17) Customer specific requirements
18) Part submission warrant (PSW)

*******************************************
     Do what you can to achieve your goal,
     Put together a plan on how to achieve that goal,
     Run until you reach that goal,
     Make comments without forgetting who you are (or) what you are trying to achieve in this world,
     If you like this video of mine, listen to my next video,
     If you find this video useful, just press on SUBSCRIBE.
***********************************************************
DISCLAIMER : This channel does not promote or encourage any illegal activities. All contents provided by this channel for General And Educational Purpose Only. Copyright disclaimer under section 107 of the copyright act 1967, allowance is made for "fair use policy "for purposes such as criticism, comment, news, reporting, teaching, scholarship and research. Fair use is a use permitted by copyright statue that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use.
#ppap #quality #effectivetimetamil
4 سال پیش در تاریخ 1399/07/15 منتشر شده است.
15,269 بـار بازدید شده
... بیشتر