Carvel Planking Ep24 Lofting the Ballast Keel

Smithy's Boatshed
Smithy's Boatshed
1.6 هزار بار بازدید - 5 روز پیش - The lead ballast keel has
The lead ballast keel has been delivered from the foundry for Sydney Wooden Boat School Principal Ian Smith's 24' Ranger class gaff sloop. Ian explains how he lofted the plans for the keel in order to build the plug, and the process of actually building the plug to the shape that the foundry will cast in lead. This is episode 24 in Ian's series on Carvel Planking on @SmithysBoatshed Channel.
5 روز پیش در تاریخ 1403/04/16 منتشر شده است.
1,622 بـار بازدید شده
... بیشتر