Kohat Tunnel Peshawar KPK | Peshawar update 2021

Basit Explore
Basit Explore
57.6 هزار بار بازدید - 4 سال پیش - Kohat Tunnel Peshawar KPK |
Kohat Tunnel Peshawar KPK | Peshawar update 2020
The Kohat Tunnel is a 1.9-kilometre-long highway tunnel under the Khigana Mountains between Kohat District of Khyber Pakhtunkhwa and Frontier Region Kohat in the Federally Administered Tribal Areas of Pakistan. The tunnel carries northbound and southbound traffic along N-55 National Highway under the Kohat Pass. Wikipedia
Opened: 2003
Length: 1.89 km (1 1⁄8 mi)
Design engineer: Sadrul Ola Rizvi (Project Director - Indus Highway NHA)
Work begun: 1999
Tunnel clearance: 3 m (9 ft 10 in)
Location: Khyber Pakhtunkhwa, Pakistan
4 سال پیش در تاریخ 1399/04/13 منتشر شده است.
57,644 بـار بازدید شده
... بیشتر