Durco Mark 3 ASME Chemical Process Pump Maintenance
123.7 هزار بار بازدید -
11 سال پیش
-
This video takes the viewer
This video takes the viewer step-by-step through disassembly, inspection, and reassembly of the Flowserve Durco Mark 3 ASME chemical process pump. Sections include:
• Disassembly
• Power End Assembly
• Power End Inspection
• Wet End Assembly
• Impeller Clearance Setting
• Mechanical Seal Installation
• Disassembly
• Power End Assembly
• Power End Inspection
• Wet End Assembly
• Impeller Clearance Setting
• Mechanical Seal Installation
11 سال پیش
در تاریخ 1392/02/05 منتشر شده
است.
123,740
بـار بازدید شده