Material Recovery Facility (MRF)
1.6 هزار بار بازدید -
2 سال پیش
-
Convergence for a better tomorrow!GNIDA
Convergence for a better tomorrow!
GNIDA has set up a Material Recovery Facility (MRF) at Sector Xu-1 to manage dry waste and wet waste with daily capacity of 10 Tonnes Per Day. Of this 3-4 TPD dry waste & 6-7 TPD wet waste is processed.
GNIDA has set up a Material Recovery Facility (MRF) at Sector Xu-1 to manage dry waste and wet waste with daily capacity of 10 Tonnes Per Day. Of this 3-4 TPD dry waste & 6-7 TPD wet waste is processed.
2 سال پیش
در تاریخ 1401/10/22 منتشر شده
است.
1,672
بـار بازدید شده