What is TIMWOOD 7 Waste in Lean Manufacturing in Hindi (हिंदी में)| TOOL for COST REDUCTION by 50%

AYT India Academy
AYT India Academy
59 هزار بار بازدید - 4 سال پیش - What is TIMWOOD 7 Waste
What is TIMWOOD 7 Waste in Lean Manufacturing in Hindi (हिंदी में)| USED FOR COST REDUCTION BY 50%  

In this video it has been described ABOUT:

7 TYPES OF WASTES i.e. TIMWOOD, that are present whithin any manufacturing system or process.

T : Transportation (ढुलाई)
I : Inventory  (सामग्री/सामान)
M : Motion/ Movement (चाल/घूमना)
W : Waiting  (प्रतिक्षा करना)
O  : Over Output  (अधिक उत्पादन)
O : Over Operations (अधिक क्रिया)
D : Defects  (कमी/ दोष)

---------------------------------------------------------------------------------------------------------------------------------------------
For TIMWOOD CRASH COURSE click here: 7 Wastes TIMWOOD in LEAN MANUFACTURIN...

For more details and other videos click on the link:  @aytindia

Lean Manufacturing & Toyota Producytion System Training Videos: LEAN Manufacturing
---------------------------------------------------------------------------------------------------------------------------------------------
Music: https://www.bensound.com

----------------------------------------------------------------------------------------------------------------------------------------------
About Myself:

Shakir Mohd (B.TECH)

• I am a B.Tech in Mechanical Engineering
• I have total working Experience of Around 7 Years in Training, Execution and Implementations of Various Lean Tools and Techniques (such as VSM, KAIZEN, TPM, 5S, Visual Management, Poka-yoke, SMED etc.) in approx. 100 Units.
• I have a wide exposure for Implementation of Lean Manufacturing Tools & Techniques to different industries like Automobile, Engineering, Food Industries, Leather Handicrafts, Leather Garments, Garments, Printing, Packaging, Shoes Industries, Plastic Injection Moulding, Aluminum Die Casting, CNC Machining, Conventional Machining, Tool Room, Press Shop, Fan Industry, Bicycle Industry, Fabrication & Sheet Metal etc. for improving their Productivity, Reducing Manufacturing cost & Rejection, 5S Levels, Employees Trainings with proper resource utilization and Implementation of various Kaizens (Improvements).

Key Skills:
• Value Stream Mapping (VSM), TIMWOOD (Seven Wastages), PQCDSME (Seven Benefits) Productivity Improvement, Time & Motion Study,
• TPM (Total Productive Maintenance), FUGAI Tags, 8 Pillars of TPM , Elimination of Six Big Losses (SSSMCB) through TPM
• 5S, KAIZEN, 7 QC Tools, VA/NVA Activities, Root cause analysis, SMED, Safety Improvements, Visual Management, etc.

----
SOME OF MY ONSITE PROJECT OF TRAINING & CONSULTANCY, COMLETED/ UNDER-PROCESS ARE:

Ultratech Cement (4 Plants)- Truck Turn Around Time  (TAT) Prject
Combit Shoes, Bahadurgarh (HR)- Plant Layout Setup Project
Printsmith (Infinity Advertising Pvt. Ltd.),Faridabad
MSME- Faridabad Engineering Cluster No.1 (9 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.2 (6 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.4 (7 Units)- LMCS Cluster
MSME- Yamuna Nagar Engineering & Fabrication Cluster (9 Units)- LMCS Cluster
MSME- Ludhiana Cycle Parts Cluster No.2 (7 Units)- LMCS Cluster
MSME- Manesar, Leather Handicraft Cluster No.1 (7 Units)- LMCS Cluster
MSME- Bahadurgarh Footwear Cluster (6 Units)- LMCS Cluster
MSME- GZB Food Cluster (9 Units)- LMCS Cluster
Raga Engineers- Core Pins Productivity Improvement Project, Faridabad (HR)
Raga Engineers- Crack Toyota Project, Faridabad (HR)
Technomech Industries, Faridabad (HR)
Woodpecker Systems, Faridabad
Falcon Vacuum Pumps, Faridabad
Welcome Footwear, Bahadurgarh
RKP Packers, Delhi
Presto Stantest Pvt., Faridabad
United Cores Private Limited, Faridabad
PMT Engineers, Faridabad
UD food Products Pvt. Ltd., Ghaziabad
GK Industries, Faridabad
Durga Engineering Works, Faridabad

-----------------------------------------------------
4 سال پیش در تاریخ 1399/01/24 منتشر شده است.
59,089 بـار بازدید شده
... بیشتر