Transmission Planning in ERCOT
8.4 هزار بار بازدید -
4 سال پیش
-
In general, transmission is needed
In general, transmission is needed to move power from generation to load. When generation on the system changes or when load grows, transmission improvement projects are often needed. Learn about ERCOT’s transmission planning process in this video.
4 سال پیش
در تاریخ 1399/08/07 منتشر شده
است.
8,481
بـار بازدید شده