Apertura Viadotto GENOVA SAN GIORGIO | entrambe le carreggiate | A10

HWYitalia
HWYitalia
186 هزار بار بازدید - 4 سال پیش - 🆂🆄🅱🆂🅲🆁🅸🅱🅴 Autostrada A10 | nuovo
🆂🆄🅱🆂🅲🆁🅸🅱🅴 Autostrada A10 | nuovo viadotto Polcevera - Genova San Giorgio ***𝓡𝓮𝓬𝓸𝓻𝓭𝓮𝓭: 5 agosto 2020 𝕯𝖗𝖎𝖛𝖎𝖓𝖌 𝖎𝖓 𝕴𝖙𝖆𝖑𝖞 𝖛𝖎𝖉𝖊𝖔𝖘 𝖥𝖮𝖫𝖫𝖮𝖶 𝖬𝖤: ■ 𝗜𝗻𝘀𝘁𝗮𝗴𝗿𝗮𝗺 ▶︎ www.instagram.com/hwyitalia/?hl=it ■ 𝗙𝗮𝗰𝗲𝗯𝗼𝗼𝗸 ▶︎ www.facebook.com/HWYitalia/ The Genoa Saint George Bridge (Italian: Viadotto Genova-San Giorgio) is a motorway viaduct that crosses the Polcevera river and the districts of Sampierdarena and Cornigliano, in the city of Genoa. It was designed by architect Renzo Piano. The bridge replaces the Ponte Morandi (Polcevera Viaduct), which partially collapsed on 14 August 2018 and was completely demolished in June 2019. The new viaduct, with its associated junctions, constitutes the initial section of the Italian A10 motorway, managed by the concessionaire Autostrade per l'Italia, which in turn is included in the European route E80. The new bridge was inaugurated on 3 August 2020. The bridge project was carried out by the Genoese architect Renzo Piano through his Building Workshop and was officially presented on 7 September 2018 together with the President of Liguria Giovanni Toti, the Mayor of Genoa Marco Bucci and the CEOs of Autostrade per l'Italia and Fincantieri, Giovanni Castellucci and Giuseppe Bono respectively. The project includes four lanes and two emergency lanes. Built as a mixed steel-concrete structure, it is 1,067 meters long and consists of 19 spans supported by 18 elliptical section reinforced concrete stacks with a constant shape. The viaduct will be constantly monitored by four robots (designed by the Istituto Italiano di Tecnologia) equipped with wheels (with which they will move along the external rails of the viaduct) and articulated arms. The role of these robots is to automate inspection of the lower surface of the bridge and the cleaning of windproof barriers and solar panels. On 18 December 2018, the two companies Salini Impregilo and Fincantieri were awarded the contract for the construction of the bridge. At a cost of 202 million euros to be rebuilt in a year with the development of the executive design entrusted to Italferr while the direction and supervision the demolition and construction of the new bridge was entrusted to the RINA certification company for an amount of 14 million euros. On 25 June 2019, the first stone was officially laid with the casting of the base of pile 9 in the presence of various authorities. The casting of the concrete slab began on 6 June 2020, an operation completed in about ten days. On 21 July 2020, the mayor of Genoa Marco Bucci made official the name of the bri
4 سال پیش در تاریخ 1399/05/15 منتشر شده است.
186,003 بـار بازدید شده
... بیشتر