Monopole Erection | Tension #Monopole #Erection #TransmissionLine #HighVoltage #Structure

Mission Transmission
Mission Transmission
545.5 هزار بار بازدید - 4 سال پیش - SECTION OF MONOPOLE• Top Segment•
SECTION OF MONOPOLE
• Top Segment
• Middle Segment 1
• Middle Segment 2
• Bottom Segment
• Cross arm
With the increase in height of Monopole the Number of Segment may increase

ASSEMBLY OF MONOPOLE

• The Monopole cross arms are assembled to the monopole body with bolts and Nuts and the the Bolts are torqued to its limit and kept ready for Erection

ERECTION OF MONOPOLE

Certain pre-requisite before starting the Erection

• Leveling of Anchor template with tubular spirit level
• Marking of Overlapping area so that during erection the overlapping portion are visible from ground

The erection of monopole is  very simple. The crane is positioned properly to lift the section. Once the Levelling of Anchor template is completed it is removed such that all the nuts below anchor template are at same level.

The process for erection of complete monopole is subdivided in the following four steps-

• Monopole bottom section is erected directly on the foundation anchor Bolts.
• Monopole Middle section-I is inserted to the erected bottom as per the Fabrication drawing.
• Monopole Middle section-II with cross arm is inserted to the erected Middle section-I.
• At last the Upper section of the Monopole with cross arm is erected above the Middle Section-II.

Situation may arise when one section does not completely overlap with other section. Under such condition, mechanical load needs to exerted

Lubricant is also advised to apply on the inner portion of Monopole section to acquire require overlapping

More on:
Foundation- Transmission Lines | Foundation
Erection- Transmission Lines | Tower Erection
Under Ground Cable- UNDERGROUND CABLE | Laying
OPGW- UNDERGROUND CABLE | Laying
Pile Load Test- Pile Load Test
Scaffolding- Scaffolding
Erection- Transmission Lines I Tower Erection
Stringing- Transmission Lines | Stringing
Conductor Sagging- Transmission Lines | Conductor Saggin...
Tower Testing- Transmission Lines | Tower Testing
GIS Termination- UNDERGROUND CABLE | GIS Termination |...
Shotcrete- Shotcrete | Gunite | Sprayed Concrete...
Monopole Erection (Suspension)- Video
Monopole Erection (Tension)- Monopole Erection | Tension #Monopole...