Inside the HS2 mega-factory making the UK's longest railway bridge

HS2 Ltd
HS2 Ltd
79 هزار بار بازدید - 2 سال پیش - See how a team of
See how a team of engineers is creating the 1,000 enormous deck segments that will be needed for the record-breaking Colne Valley Viaduct.

Stretching for 3.4km across a series of lakes and waterways just outside London, the viaduct will carry high-speed trains as part of the HS2 project, designed to improve rail links between London, Birmingham and North, boost the economy and provide a low carbon alternative to car and air travel.

The huge deck segments – which weigh up to 140 tonnes – are being made on site at a temporary factory built specifically for the project. The mammoth 100m long building, which is visible from the M25, has an internal volume of 105,000 cubic metres – making it larger than the Royal Albert Hall.

Every segment will be a slightly different shape depending on where it fits into the viaduct and the modular approach was chosen to ensure quality, safety and efficiency in production and to avoid bringing them in by road.

Find out more at https://www.hs2.org.uk/colne-valley

Follow us on social media:
Twitter: Twitter: HS2ltd
Instagram: Instagram: hs2ltd
Facebook: Facebook: HS2ltd
LinkedIn: LinkedIn: high-speed-two-hs2-ltd

#HS2 #Trains #engineering #infrastructure  #ColneValleyViaduct

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected].
2 سال پیش در تاریخ 1400/11/20 منتشر شده است.
79,088 بـار بازدید شده
... بیشتر