Pezzimenti Tunnelbore - Pipejacking in Soft Ground Conditions
4.5 هزار بار بازدید -
8 سال پیش
-
Pezzimenti Tunnelbore - Pipejacking Capability.
Pezzimenti Tunnelbore - Pipejacking Capability. Microtunnelling long distances in soft ground at flat grades under critical surface features.
Detailing 3 pipejack projects (out of 152 total pipejacking projects) that were completed simultaneously in September 2015.
Visit: www.pezzimenti.com.au
Detailing 3 pipejack projects (out of 152 total pipejacking projects) that were completed simultaneously in September 2015.
Visit: www.pezzimenti.com.au
8 سال پیش
در تاریخ 1395/02/16 منتشر شده
است.
4,518
بـار بازدید شده