8 هزار بار بازدید - 13 سال پیش - ADCO were appointed by the
ADCO were appointed by the Port of Brisbane Authority to deliver the design, construction and fitout of its new headquarters in Brisbane. The project comprised of a 6,400m2, 7 level office building featuring a high level of architectural design and intent. The reinforced concrete framed building incorporated a unique design of curved external balconies and a large open span foyer that creates an amazing, contemporary work environment.

The building achieved a 5 Star Green Star rating for Design, As-Built and Interiors, and is the first building in Australia to do so under Version 3 of the Green Building Council's commercial rating tool. It incorporates sustainability initiatives such as electronically controlled external blinds to reduce heat loads on the building, a central atrium providing natural ventilation, grey water recycling, storm water harvesting and reuse and a chilled beam air conditioning system.

The $35 million project was completed on programme in 14 months and to the highest standards of quality.
13 سال پیش در تاریخ 1390/03/11 منتشر شده است.
8,070 بـار بازدید شده
... بیشتر