Mountain Village Gondola, Telluride, CO

The Coloradan Lift Guy
The Coloradan Lift Guy
187 بار بازدید - 12 ماه پیش - The MV Gondola is split
The MV Gondola is split into two sections by San Sophia Station, the summit of the gondola. Stage 2 was built first, in 1992 by CTEC. On the Mountain Village Side. Stage 1 was built by Garaventa CTEC in 1996, on the Telluride side. These sorts of collaborated lifts are very rare. As of 2023, new cabins have been added to increase capacity, and old Garaventa AG grips have been removed and some are currently located in San Sophia Station, as Doppelmayr replaced the grips recently. Stage 1 and Stage 2 are divisible. The lift will stay open from 6am to midnight, and seasonally to 2am the next day. Lift was filmed after Bike Park operation hours.
12 ماه پیش در تاریخ 1402/04/28 منتشر شده است.
187 بـار بازدید شده
... بیشتر