Building A-frame house. Part 9. board under the house, gables, windows and doors.

Fitsych.M
Fitsych.M
27.6 هزار بار بازدید - 2 سال پیش - At this stage of construction,
At this stage of construction, I installed the boards under the house, prepared the gables for the installation of windows and doors, made temporary doors and the guys installed windows and doors on the terrace.  Almost all the work processes in this video took place in parallel with the covering of the house, but to make it clearer I decided to divide the video into two parts.  My order of windows and doors for the terrace took a long time to make, so it is better to order them in advance.


- Want to support me or get detailed drawings and instructions? - https://patreon.com/user?u=81095557&u...
- My Instagram Instagram: fitsych.m
2 سال پیش در تاریخ 1401/08/27 منتشر شده است.
27,612 بـار بازدید شده