DELHI MEERUT RRTS CORRIDOR PROGRESS UPDATE 2020 | MEGA PROJECTS IN INDIA 2020 🇮🇳 @IndianInfraMan

Indian Train Man
Indian Train Man
42.1 هزار بار بازدید - 4 سال پیش - DELHI MEERUT RRTS CORRIDOR PROGRESS
DELHI MEERUT RRTS CORRIDOR PROGRESS UPDATE 2020 | MEGA PROJECTS IN INDIA 2020 🇮🇳

𝙎𝙐𝘽𝙎𝘾𝙍𝙄𝘽𝙀 𝙈𝙔 𝙎𝙀𝘾𝙊𝙉𝘿 𝘾𝙃𝘼𝙉𝙉𝙀𝙇 𝘼𝙇𝙎𝙊:-sanskarsharma98

𝘼𝘾𝙏𝙄𝙑𝙀 𝙊𝙉 𝙄𝙉𝙎𝙏𝘼𝙂𝙍𝘼𝙈:-Instagram: indiantrainman


Delhi–Meerut Regional Rapid Transit System (Delhi–Meerut RRTS) is an 82.15 km long, under-construction, semi-high speed rail corridor connecting Delhi-Ghaziabad-Meerut. It is one of the three rapid-rail corridors planned under Phase-I of Regional Rapid Transport System (RRTS) project of National Capital Region Transport Corporation (NCRTC). With maximum speed of 160 km/h (99.42 mph), the distance between Delhi and Meerut will be covered in around 55 min.

The corridor would be beneficial for the development of the region and help connect the large number of townships and centres of economic activity that are already planned along this corridor.

Length = 82 km

Number of RRTS Stations =16

Number of additional Stations for Meerut MRTS = 5

Of the entire length, 68.03 km (42.27 mi) is elevated, 14.12 km (8.77 mi) is underground and 1.45 km (0.90 mi) will be at grade for connections to two depots that will come up at Duhai, Ghaziabad and Modipuram, Meerut. In densely populated areas of Delhi and Meerut, the route will be underground, including that of the river Yamuna.The entire route is designed for a maximum speed of 180 km/h (111.85 mph) and the operating speed will be 160 km/h (99.42 mph).Average speed (including all the stops) will come around 100 km/h (62.14 mph).

The Delhi-Meerut corridor starts from Sarai Kale Khan station in Delhi. The corridor will pass through areas of Delhi, Ghaziabad and Meerut, terminating at Modipuram in Meerut.

Hazrat Nizamuddin Sarai Kale Khan will also become a transit hub with the presence of Hazrat Nizamuddin metro station, Sarai Kale Khan ISBT and the Hazrat Nizamuddin railway station in vicinity.

The 38.05 km (23.64 mi) long Sahibabad - Meerut South section, including Duhai Depot, is expected to become operational by January 2023, the 16.60 km (10.31 mi) Hazrat Nizamuddin - Sahibabad in January 2024 and the remaining 37.40 km (23.24 mi) Meerut South - Modipuram in July 2024.

There will be a total of 16 stations Multimodal transport hubs for integration with existing transportation such as Delhi Metro, Indian Railways, UPSRTC are planned at Anand Vihar, Sahibabad and Shaheed Sthal stations.


#delhi #rrts #indianrailways
4 سال پیش در تاریخ 1399/05/06 منتشر شده است.
42,139 بـار بازدید شده
... بیشتر