Narrated 400sq ft A-frame 17 day cabin build (part 1) Canada east coast Spring 2023

Craig Nakamoto
Craig Nakamoto
455.8 هزار بار بازدید - پارسال - This is a 17 minute
This is a 17 minute long narrated collection of stop-action, video, and photos of the first two trips out to the east coast to build our (not from a kit) a-frame.  The first trip was 11 days in April and the second was 5 days in May.  The narration describes the project and some of the construction details.

The total cost for this build (excluding all travel and labour), was about CDN $40k  (metal roof $7k, windows and doors $6k, insulation $5k, foundation $3k, lumber and hardware $18k). This got us an open 20’ x 20’ main floor (with 12 feet of 8.5 foot high ceiling and 8 feet of cathedral ceiling), a 12’ x 10’ loft (with a 6 foot high ceiling, just in the middle), a 8’ x 20’ front deck, fully insulated floor and walls and fully vented, steel roof.  This also includes interior and exterior spruce siding for all walls and soffits.  Keep in mind that the useable square footage is less because of the angled exterior walls.  

A-frame design taken from the book Cabins & Cottages published by Fox Chapel Publishing (ISBN 1565239679), available on amazon.ca at:

https://www.amazon.ca/gp/product/B08V...

The main changes I made to their design was to overhang the roof by 2 feet on the back and 4 feet on the front and to add roof venting from under the cabin straight up to the roof peak.

All materials ordered from (and delivered by) local businesses.

Here is a link to my scanned drawings (they were in pretty bad shape by the time I scanned them...):

https://www.dropbox.com/s/gf4qg79flfo...

0:00 Introduction
0:01 CAPE BRETON AFRAME BUILD PRELIMINARY SITE VISIT APRIL 1, 2023
0:41 FOUNDATION GRAVEL TO POST, BEAMS
1:33 FOUNDATION STRAIGHTENING, LEVELING, SQUARING, BRACING
2:51 TRUSSES CUTTING ANGLES AND ASSEMBLING JOISTS
4:11 TRIANGLES ASSEMBLING AND RAISING TRIANGLES AND ROOF
4:52 TRIANGLES MORE TRIANGLES AND ROOF SHEATHING
5:56 ROOF SHEATHING, LOFT FLOOR
8:37 ROOF SHEATHING, MEMBRANE, STEEL ROOF
9:32 REST DAY + MAIN FLOOR WORK UNDERSHEATHING, SET UP VENTS, INSULATE
11:17 BACK WALL FRAMED, SHEATHED, TYKEK, WINDOWS, DOOR
11:26 FLOOR AND FRONT WALL FINISHED MAIN FLOOR, STARTED FRAMING FRONT WALL
12:04 LAST DAY FRONT WALL, DECK, FINISHED ROOF