Amrit Bharat Express Journey Vlog 🇮🇳 | Upgraded Sleeper Class and General | Indian Railways

Abhijith Bhakthan
Abhijith Bhakthan
120.9 هزار بار بازدید - 6 ماه پیش - Amrit Bharat Express Journey Vlog
Amrit Bharat Express Journey Vlog 🇮🇳 | Upgraded Sleeper Class and General | Indian Railways #amritbharatexpress #indianrailways

0:00 - Intro
0:34 - SMVT Bengaluru Station
3:28 - Boarding on Amrit Bharat
6:51 - Interior
10:13 - Journey Begins
11:41 - About Malda Town Amrit Bharat
16:53 - Jolarpettai
19:12 - Jolarpettai to Katpadi
22:01 - Katpadi to Renigunta
24:40 -  Renigunta Retiring Room
26:07 - Conclusion

Kollam to Kacheguda Train Vlog: Sabarimala Special Train Journey ! Ko...

Link to book IRCTC Retiring Rooms: https://rr.irctc.co.in/#/home

The Amrit Bharat Express is a no-frills superfast express service operated by Indian Railways. It is a non air-conditioned, low-cost, sleeper cum unreserved service connecting cities that are more than 800 km (500 mi) apart or take more than ten hours to travel with existing services. The trainset consists of two locomotives, one on either side and 22 coaches with a maximum operating speed of 110–130 km/h (68–81 mph). The train entered commercial service on 1 January 2024.

In July 2023, Indian railways announced plans for a non air-conditioned train with sleeper and general facilities for long-distance travel. The train-sets are manufactured by Integral Coach Factory, Chennai at the cost of ₹65 crore (US$8.1 million) per train-set. The first train was flagged off on 30 December 2023 and entered commercial service on 1 January 2024.

Amrit Bharat trains have upgraded non air-conditioned second-class and three-tier sleeper coaches. The coaches are manufactured by Integral Coach Factory at Chennai. In contrast to other Indian trains, the train-sets will have a locomotive at both ends in a push-pull configuration, enabling better acceleration and shorter turnaround times in direction reversals. The train-sets will be powered by two WAP-5 locomotives with vibration resistance engines manufactured by Chittaranjan Locomotive Works.

Each train-set consists of 22 coaches: 12 3-tier sleeper class, eight second-class and two luggage coaches. The coaches are equipped with electric outlets, reading lights, CCTV cameras, bio-vacuum toilets, Sensor-based water taps and Passenger information system. The train-sets will also have semi-permanent couplers to avoid shocks during starting and stopping of the train and fully-covered vestibules to facilitate stability and safety.  The trains will operate at a maximum permissible speed (MPS) of 130 km/h.

On 30 December 2023, the train was flagged off by then Prime Minister Narendra Modi from Ayodhya Dham Junction. The first commercial service commenced on 1 January 2024.

The 13434/13433 Malda Town - SMVT Bengaluru Amrit Bharat Express is India's 2nd Non-AC Superfast Amrit Bharat Express train, which runs across the states of Karnataka, Tamil Nadu, Andhra Pradesh, Odisha, Jharkhand and West Bengal by connecting the city of Malda Town in West Bengal with Bangalore, the capital city of Karnataka.

This express train was inaugurated on 30 December 2023 by Prime Minister Narendra Modi via video conferencing from Ayodhya Dham Junction.

This train is operated by Indian Railways, connecting Malda Town and SMVT Bengaluru. It is currently operated with train numbers 13434/13433 on Weekly services

It is the second Amrit Bharat Express train in which the locomotives were designed by Chittaranjan Locomotive Works (CLW) at Chittaranjan, West Bengal and the coaches were designed and manufactured by the Integral Coach Factory at Perambur, Chennai under the Make in India Initiative.
6 ماه پیش در تاریخ 1402/11/03 منتشر شده است.
120,923 بـار بازدید شده
... بیشتر