The Work Breakdown Structure
4.5 هزار بار بازدید -
پارسال
-
The Work Breakdown Structure (WBS)
The Work Breakdown Structure (WBS) is indispensable as part of project’s lifecycle and timeline. As an important part of project planning, the WBS begins with a hierarchy of tasks and levels that help to identify how the project will flow within a designed timeline set by the project manager. This video explains this concept with the aid of an example.
پارسال
در تاریخ 1401/12/29 منتشر شده
است.
4,530
بـار بازدید شده