A technical challenge realized by RAZEL-BEC on the Kariba dam of Zambesi
79.9 هزار بار بازدید -
7 سال پیش
-
56 years after the inauguration
56 years after the inauguration of the Kariba dam on the Zambesi River, a pit must be created to strengthen its foundations. A real technical feat performed by RAZEL-BEC.
7 سال پیش
در تاریخ 1396/12/24 منتشر شده
است.
79,927
بـار بازدید شده