Questions:
Standard Deviation (S.D)= _______ MAD
MAD = _______ S.D.
In a linear Programming Problem (LPP), which of the following must be hold?
In PERT, activity time estimates are distributed according to
If a company manufacture ‘𝒙’ units of product ‘A’ and ‘𝒚’ units of ‘B’ with associated profits of Rs.5 and Rs.3 then which of the following is the objective function to maximize is the profit?
The ________ variable is chosen by examining the cost coefficients in the objective function.
Modeling of a Linear Programming problem from a real life world is a/an _______
If the economic order quantity and the annual demand of a product are 2500 and 5000 units respectively, then WITHOUT any shortage the time between the consecutive orders is ____ months.
If the variance of the project length = 25, expected and schedule times are 40 and 36 respectively, then the Standard Normal Variable of the given project is ________.
In Simplex Standard table to solve an LP problem, if the ratio by taking the RHS of each row and dividing by the corresponding element of the key column is {2/3.5, 1/3, -1/2}, then which of the following variable will be leaving?
While solving a Linear Programming problem by Simplex Method, an inequality says: is transformed into strict equality of the form ________,  
The inequality 𝟑𝒙−𝟐𝒚≥𝟏𝟒 is equivalent to _______
Time by which an activity can expand without affecting subsequent activity is ________
Which of the following distribution gives the probability of completing the assigned project by considering the expected time of any activity as random variable?
Which of the following quantity will vary in case of Dynamic Order Quantity Model?
In the relation of finding the expected time of an activity, most likely time is weighted more than the other optimistic and pessimistic times and these exist in the ratio of _______
If the total inventory in one cycle of ‘t’ units of time is ‘(1/2)Qt’, then which of the following is the average inventory at any time?
If the economic order quantity and the annual demand of a product are 2500 and 5000 units respectively, then WITHOUT any shortage the number of orders are ______
Which of the following relation is correct for the Standard Deviation of an activity times having optimistic, pessimistic and most likely values as 4, 8 and 6 days respectively?