Flow Test of an Electric Fire Pump

Fire Sprinkler Tech
Fire Sprinkler Tech
4.8 هزار بار بازدید - 11 ماه پیش - Performing the required NFPA 20
Performing the required NFPA 20 and 25 annual flow test of a small 500gpm horizontal split case centrifugal fire pump with an electric motor driver. There are several required items that are not covered in this video. This video is just to give you an idea of what is done during a fire pump flow test. Even after I cut some steps out of the video, it's still long. I added a timeline to help you find each step.



Timestamp
0:00 - Introduction
2:55 - PSA about NFPA 25 8.3.3.13
3:50 - Grease pump
6:00 - Calibrated gauges
10:44 - Tachometer
12:13 - Flow Chart
15:53 - Test header and hose setup
18:20 - Hose monster setup
22:23 - Test header control valve
22:35 - Start churn test
27:42 - Start 100% flow test
30:06 - 100% flow readings
31:41 - Start 150% flow test
35:17 - 150% flow readings
36:29 - Generator test at peak load
38:43 - Readings while on generator
40:37 - Conclusion