Why India is Building ₹1,80,000 Crore Bullet Train
1 میلیون بار بازدید -
11 ماه پیش
-
🗺 View Mumbai Transit Maps:
🗺 View Mumbai Transit Maps:
🚅 Download Bullet Train Map for free:
🎥 Become a Member:
India's First High-speed railway line is under-construction between Ahmedabad and Mumbai. Its total length will be 508 km which will handle trains with speeds upto 320 km/h. Whole journey would take around 2.5 hours, down significantly from the current 6-7 hours. Estimated to cost ₹1,80,000 Crore.
Map References: OpenStreetMap Contributors, NHSRCL, Wikipedia, GoogleMaps, Mapbox.
Music: Storyblocks
Chapters:
https://www.seevid.ir/fa/w/1PR724lmuxM Intro
https://www.seevid.ir/fa/w/1PR724lmuxM Ahmedabad-Mumbai First Rail Route
https://www.seevid.ir/fa/w/1PR724lmuxM Bullet Train Planning
https://www.seevid.ir/fa/w/1PR724lmuxM Ahmedabad-Mumbai Bullet Train
https://www.seevid.ir/fa/w/1PR724lmuxM Benefits of Bullet Train
https://www.seevid.ir/fa/w/1PR724lmuxM Construction Challenges
https://www.seevid.ir/fa/w/1PR724lmuxM How Bullet Train Works
https://www.seevid.ir/fa/w/1PR724lmuxM Delhi-Mumbai Corridor
https://www.seevid.ir/fa/w/1PR724lmuxM Future Extension to Delhi
https://www.seevid.ir/fa/w/1PR724lmuxM Japan Shinkansen
https://www.seevid.ir/fa/w/1PR724lmuxM France TGV
https://www.seevid.ir/fa/w/1PR724lmuxM Worldwide High Speed Rail
11 ماه پیش
در تاریخ 1402/08/16 منتشر شده
است.
1,028,146
بـار بازدید شده