Crossrail Railway Systems: Track installation between Royal Oak Portal and Bond Street

مهندسی راه آهن - امین امانت
مهندسی راه آهن - امین امانت
64 بار بازدید - 6 سال پیش - This video highlights the latest
This video highlights the latest fit-out activity underway in the tunnels between Royal Oak Portal and Bond Street. To support permanent track installation in the west, a concrete shuttle is used to transport concrete from a temporary railhead at Westbourne Park. Pre-mixed fibre reinforced concrete from the batching plant is loaded onto the shuttle, delivered into the tunnels and pumped into place. A fleet of customised machinery is supporting the fit-out of the tunnels. These works are part of Crossra