Petro drill Logistic Co

شرکت پترو حفار - PDL
شرکت پترو حفار - PDL
75 بار بازدید - 4 سال پیش - Petro drill Logistic Co designed
Petro drill Logistic Co designed and implemented the horizontal directional drilling method for the first time in the Middle East to transport liquefied petroleum gas from Parsian to Assaluyeh. The drilling is being constructed along the construction of an 18-inch pipeline with a length of 63 km with the aim of transferring 135,000 barrels of liquefied petroleum gas per day from Parsian Mehr Complex to Assaluyeh Complex Due to the harsh conditions of the mountainous region where these pipes are built, in a creative way, hdd method or horizontal directional drilling has been designed and implemented for the first time in the Middle East. The implementation of this method has reduced the excavation operations by one million and 200 thousand cubic meters and saves a lot of construction costs. TVD: +290 feet Entry - Exit Diff Elevation: 620 feet Guidance System: Gyro North Seeker plus Paratrack 2 Casing : 24 inch Pilot Hole: 9-7/8 inch mud motor Final hole opener Size: 34 inch forward and back ward FOC: integrated with casing
4 سال پیش در تاریخ 1399/11/21 منتشر شده است.
75 بـار بازدید شده
... بیشتر